Selling Mine in Chile

Mina Vicuña







Vicuña Mining Project Chile
Data Room: Vicuña Project

Vicuña Mining Project: Copper, Gold & Silver

Located in the Vicuña Commune, Elqui Province, Coquimbo Region, Chile. A consolidated package of 35 active mining concessions spanning 150 hectares across the El Bajadero and Los Horcones sectors, featuring high-potential outcrops of precious and base metals.

The project comprises three main groups of exploitation mining concessions, totaling 150 hectares in the El Bajadero and Los Horcones sectors.

  • San Pablo 1 to 10 (60 Hectares | 10 Concessions)
  • La Malvina 1 to 20 (60 Hectares | 20 Concessions)
  • La Laura 1 to 5 (30 Hectares | 5 Concessions)

All concessions are duly registered with the Vicuña Mining Conservator. Mining patents (annual taxes) are fully paid and up-to-date (through 2026). Ownership is backed by a recognized legal succession and a notarized Special Power of Attorney for sale and representation.

  • Mining Patents Paid & Current (Through March 2026)
  • Notarized Special Power of Attorney & Succession Rights Verified

The deposit consists of outcropping minerals primarily producing Copper, Gold, and Silver. The terrain is mountainous with rocky areas and steep slopes. Access is available via Route 41, connecting La Serena with Vicuña.

  • Primary Mineralization: Copper (Cu), Gold (Au), and Silver (Ag)
  • Access & Logistics: Route 41, ~134 km from La Serena



Copper mining operations Chile
Copper mining operations Chile
Project Documentation

Vicuña Project Data Room

View the complete legal, technical, and financial documentation. Documents are protected and cannot be downloaded or copied.

Legal Title Package

Sentencias constitutivas, poderes notariales y certificados de propiedad.

View Document

Assay Report (FGF)

Independent lab results showing high-grade Au, Ag, and Cu from surface outcrops.

View Document

Patent Receipts

Official payment confirmations for all 35 concessions, valid through March 2026.

View Document

Concession Boundaries

Visual map and precise UTM coordinates for all 35 concessions.

View Document



Interested in the Vicuña Project?

+46736773304 Investor Relations 24/7
Vicuña Project FAQs

Questions About the Vicuña Copper-Gold-Silver Project?

Get clear answers on the geological potential, legal status, UTM coordinates, and acquisition terms for the 150-hectare consolidated package in the Elqui Province.

The Data Room includes independent laboratory reports (e.g., FGF Análisis Minero) confirming high-grade surface outcrops. Notable results include ~51.4 g/t Au in the La Malvina sector and ~47.1 g/t Au in the La Laura sector, alongside significant Copper (Cu) and Silver (Ag) values. Full assay certificates, geological maps, and UTM coordinates are available for verified investors.
No. The Vicuña Project is exclusively available for a 100% asset sale (full transfer of ownership of the 35 exploitation concessions). We are not currently considering Joint Ventures, earn-ins, or offtake agreements. The Data Room contains all necessary legal documentation, including notarized Special Powers of Attorney and verified succession rights, to facilitate a swift and secure transfer of title to a qualified buyer.
The project comprises 150 hectares across 35 fully constituted exploitation concessions (San Pablo, La Malvina, and La Laura). All mining patents (annual taxes) are fully paid and up-to-date through 2026. Physical access is excellent, located just off Route 41, approximately 134 km from the port city of La Serena, making logistics, equipment mobilization, and future development highly viable.
mining project inquiry form


Request Project Information

Specify your area of interest for a full acquisition. Our investor relations team responds within 24 hours.