Selling Mine in Chile

Mina California







Mina California Gold Project Chile
Data Room: Mina California Project

Mina California: Approved Underground Gold Asset

Located in the Altovalsol sector, La Serena, Elqui Province, Coquimbo Region, Chile. A fully SERNAGEOMIN-approved underground gold exploitation project (Res. Ex. N°0453/2020) spanning 50 hectares across 10 concessions, featuring existing underground infrastructure, active adit at Level 350, and defined 36-month operational roadmap.

Fully approved underground gold exploitation project by SERNAGEOMIN (Res. Ex. N°0453/2020), with existing operational infrastructure including a main adit at Level 350 (142m crosscut + 50m vein drive), two surface pits at Level 425, and a defined 5-level underground development plan.

  • SERNAGEOMIN Approved Exploitation Plan (Res. Ex. N°0453/2020, July 21, 2020)
  • Production Capacity: 900 tons/month Au ore | 1,130 tons/month total (ore + waste)
  • Mining Method: Underground (Cut-and-Fill / Shrinkage Stoping) | 36-Month Roadmap
  • Existing Infrastructure: Adit Level 350, Camp, Power, Waste Management, Explosives Magazine

The project is held under concession package "California 1 to 10" (Rol Nacional N°04101-0801-1), owned by SLM California Una de San Pedro de Nolasco (RUT 77.494.180-0). An active lease agreement with Minera Buenaventura SpA (RUT 76.984.936-K) is in place since July 17, 2020, auto-renewable. All annual patents are paid and current.

  • "California 1 al 10" — 10 Concessions | 50 Hectares | Active & Good Standing
  • Active Lease Agreement + SERNAGEOMIN Exploitation Approval Transferable
  • 100% Acquisition of Asset/SPV Including Approved Exploitation Plan

Hosted in silicogranetiferous rocks within metandesites, metasandstones, and metatuffs (N30°W strike, 30°–55°E dip). Mineralization consists of massive silica, hematite and limonite veinlets, gold, malachite, and locally chalcopyrite. Vein thicknesses range from 1 to 6 meters with recognized surface strikes up to 200 meters.

  • Primary Mineralization: Gold (Au) up to 9.13 g/t | Secondary: Copper (Cu) credits
  • UTM Coordinates (PSAD 56/H19): N 6.688.542 | E 297.485 | Elevation: 349 m.a.s.l.
  • Access: Route 41 (La Serena → Vicuña), 12 km + 4 km NE to Altovalsol (~16 km from La Serena)



Mina California underground gold operations Chile
Mina California adit level 350 Chile
Project Documentation

Mina California Data Room

View the complete legal, regulatory, and technical documentation. Documents are protected and cannot be downloaded or copied.

SERNAGEOMIN Approval

Resolución Exenta N°0453/2020 — Full approved underground exploitation plan with 36-month operational roadmap.

View Document

Legal Title & Lease

Concession ownership (SLM California Una), lease agreement with Minera Buenaventura SpA, and patent receipts.

View Document

Underground Mining Plan

Detailed 5-level development plan (Levels 349–309), crosscuts, ramps, ventilation shafts, and infrastructure layout.

View Document

Investment Teaser (CIM)

Confidential Information Memorandum with full transaction structure, scale-up analysis, and acquisition protocol.

View Document



Interested in the Mina California Project?

+46 73 677 33 04 Nikol Castro | Managing Director | Delaguarda Group®
Mina California FAQs

Questions About the Mina California Approved Gold Project?

Mina California holds a fully approved Exploitation Plan by SERNAGEOMIN (Chile's National Geology and Mining Service), issued via Resolución Exenta N°0453/2020 on July 21, 2020. This eliminates the primary permitting bottleneck that typically delays gold projects by years. The approval covers a complete 36-month underground mining roadmap with a production target of 900 tons/month of gold ore. Additionally, existing underground infrastructure is already in place, including a main adit at Level 350 (142m crosscut + 50m vein drive), camp facilities, power access, waste management infrastructure, and an approved explosives magazine — dramatically reducing time to first cash flow.
The deposit is hosted in silicogranetiferous rocks within a sequence of metandesites, metasandstones, metatuffs, and related units striking N30°W with dips of 30°–55°E. The mineralized structure consists of massive silica with hematite and limonite veinlets, native gold, malachite, and locally chalcopyrite. Vein thicknesses range from 1 to 6 meters with recognized surface strikes up to 200 meters. Historical and project-grade assays confirm grades up to 9.13 g/t Au, with secondary Copper (Cu) credits from chalcopyrite and malachite occurrences.
The approved plan develops five underground levels (349, 339, 329, 319, and 309 m.a.s.l.), connected by a main ramp at -12% inclination (82m length, 3x3m section). Each level extends 300 meters with 3x3m cross-sections. Ventilation and emergency escape is provided by Chimney CH-1 (61m, 73° inclination, breaking to surface at 410 m.a.s.l.) plus three inter-level connection chimneys every 70 meters (7m length, 2x2m section). Mining method is underground selective extraction (cut-and-fill/shrinkage stoping), designed for low waste dilution. Total extraction capacity: 1,130 tons/month (900 tons ore + 230 tons waste).
The concession package "California 1 al 10" (Rol Nacional N°04101-0801-1) is owned by SLM California Una de San Pedro de Nolasco (RUT 77.494.180-0). An active lease agreement with Minera Buenaventura SpA (RUT 76.984.936-K) has been in place since July 17, 2020, auto-renewable for 2-year periods. The transaction is structured as a 100% acquisition of the asset/SPV, including transfer of the SERNAGEOMIN-approved exploitation plan. All annual mining patents are paid and current. Access to the full Data Room, including the SERNAGEOMIN resolution, lease documentation, and UTM boundary maps, requires execution of an NDA and payment of Delaguarda Group's introductory fee.
Mina California is located in the Altovalsol sector, just 16 km from the city of La Serena (12 km via Route 41 towards Vicuña + 4 km NE to Altovalsol). At an elevation of 349 m.a.s.l. (UTM PSAD 56/H19: N 6.688.542 | E 297.485), the site benefits from proximity to La Serena's urban infrastructure, port facilities, and regional power grid. On-site infrastructure includes: operational camp, main adit (Level 350), two surface pits (Level 425), waste dump (20,000-ton capacity), fuel storage area, industrial waste management zone, and approved explosives magazine. The project was designed by Mining Execution Engineer Jaime Varela Rojas and is ready for immediate scale-up by a well-capitalized operator.
Mina California gold project inquiry form


Request Data Room Access

Strict protocol: NDA execution and introductory fee required to access the CIM, SERNAGEOMIN approval documentation, and full technical files. Our investor relations team responds within 24 hours.