Selling Mine in Peru

Mina Alpes & Cumbres







Mina Alpes y Cumbres Fully Permitted Underground Mining Asset Peru
Data Room: Alpes y Cumbres Project

Mina Alpes y Cumbres: Fully Permitted Underground Mining Asset

Located in Chipurana District, San Martín Province, San Martín Department, Peru. A highly de-risked, fully titled 100-hectare metallic mining concession (code N° 010046418) held by Cia. Minera Alpes y Cumbres S.R.L. (RUC 20602722091). Features full SERNANP compatibility approval (Parque Nacional Cordillera Azul buffer zone), approved CIRA (N° 0014-2020-DDCSAM/MC) for underground extraction area "UKU", and formalized ANA water rights accreditation (0.15 hm³/year from Río Huallaga). Registered at SUNARP Partida N° 11381890.

Mina Alpes y Cumbres is a fully permitted, 100-hectare metallic mining concession with an approved underground extraction area ("UKU") and formalized surface water usage rights of up to 0.15 hm³ annually from Río Huallaga. The environmental and operational framework is fully established, providing a rare "shovel-ready" foundation for a well-capitalized operator to inject strategic CAPEX and commence underground extraction immediately.

  • Concession Area: 100 Hectares (Fully Titled, No Reductions)
  • Mining Method: Underground Extraction (Approved Designated Area "UKU")
  • Water Rights: 0.15 hm³/Year (Formally Accredited by ANA from Río Huallaga)
  • INGEMMET Code: N° 010046418 | Resolution: 0713-2019-INGEMMET/PE/PM

Unlike typical early-stage exploration projects, this asset has successfully navigated the most complex administrative and environmental bottlenecks in the Peruvian mining sector. All preliminary environmental and cultural clearances are secured, and the legal entity (Cia. Minera Alpes y Cumbres S.R.L.) is in good standing with a clean corporate structure. Current shareholders: Felix Teodorico Romero Lopez (95%) and Jorge Arturo Ramos Cafferata (5%).

  • SERNANP Compatibility Approval (Parque Nacional Cordillera Azul Buffer Zone)
  • CIRA N° 0014-2020-DDCSAM/MC Approved (Certificate of Non-Existence of Archaeological Remains)
  • ANA Water Rights Accreditation (Res. N° 340-2020-ANA/AAA-HUALLAGA)
  • SUNARP Partida N° 11381890 | Vigencia Paid Through 2024

The concession is located in the San Martín Region of Peru — a Tier-1 Andean jurisdiction with established mining culture and favorable geological potential for metallic deposits. The project is situated within a protected area buffer zone (Parque Nacional Cordillera Azul) with full SERNANP compatibility, providing a secure environmental framework for long-term underground operations. Capture point at 145 m.a.s.l.

  • Location: Chipurana / Huimbayoc Districts, San Martín Province, San Martín Department, Peru
  • UTM Coordinates (WGS 84, Zone 18): N 9,300,000 / E 420,000 (NW corner)
  • Water Capture Point: E 419,040 | N 9,229,804 | Altitude: 145 m.a.s.l.
  • Environmental Setting: Parque Nacional Cordillera Azul Buffer Zone (SERNANP Compatible)



Mina Alpes y Cumbres fully permitted underground mining Peru
Mina Alpes y Cumbres SERNANP CIRA ANA permitted asset
Project Documentation

Mina Alpes y Cumbres Data Room

View the complete SERNANP, CIRA, ANA, and SUNARP documentation. Documents are protected and cannot be downloaded or copied.

SERNANP Compatibility

Full compatibility approval for location within Parque Nacional Cordillera Azul buffer zone (Oficio N° 1085-2018).

View Document

CIRA Certificate N° 0014-2020

Approved Certificate of Non-Existence of Archaeological Remains for underground extraction area "UKU" (Ministry of Culture).

View Document

ANA Water Rights (Res. 340-2020)

Formalized water rights accreditation — up to 0.15 hm³ annually from Río Huallaga for underground operations.

View Document

Investment Teaser (CIM)

Confidential Information Memorandum with full corporate structure, SUNARP registration, and acquisition protocol.

View Document



Interested in the Mina Alpes y Cumbres Project?

Mina Alpes y Cumbres FAQs

Questions About the Fully Permitted Mina Alpes y Cumbres Underground Mining Asset?

Mina Alpes y Cumbres holds the most comprehensive permitting package in our portfolio — a rare combination that typically takes years to secure in Peru's mining sector: (1) Full SERNANP Compatibility Approval (Oficio N° 1085-2018-SERNANP-DGANP), confirming the project's compatibility with the Parque Nacional Cordillera Azul buffer zone; (2) Approved CIRA N° 0014-2020-DDCSAM/MC (Certificate of Non-Existence of Archaeological Remains) from the Ministry of Culture, specifically for the underground extraction area "UKU" in Chipurana district; (3) Formalized Water Rights Accreditation from ANA (Res. N° 340-2020-ANA/AAA-HUALLAGA) for up to 0.15 hm³ annually from Río Huallaga. These three permits represent the most complex administrative bottlenecks in Peruvian mining — all already secured for this asset.
The project holds formalized water rights accreditation from Peru's National Water Authority (ANA) via Resolución Directoral N° 340-2020-ANA/AAA-HUALLAGA (dated November 19, 2020) for up to 0.15 hm³ (150,000 cubic meters) annually from the Río Huallaga. The capture point is located at UTM coordinates E 419,040 | N 9,229,804 at an altitude of 145 m.a.s.l. in Chipurana-Navarro. This is a critical operational requirement for underground mining operations, providing sufficient water allocation for extraction, processing, and site operations. Water rights are typically one of the most challenging permits to secure in Peru, often taking 2-4 years of administrative process. Having this already accredited dramatically de-risks the operational timeline and provides a secure foundation for long-term underground extraction.
The 100-hectare metallic mining concession (code N° 010046418) is fully registered at SUNARP under Partida N° 11381890 (Zona Registral N° V - Sede Trujillo) with a clean title and no encumbrances. The concession was granted via INGEMMET Resolution N° 0713-2019-INGEMMET/PE/PM on March 14, 2019, and became consented on May 9, 2019. The legal entity holding the asset is Cia. Minera Alpes y Cumbres S.R.L. (RUC 20602722091), a Peruvian limited liability company incorporated on December 19, 2017, with active status at SUNAT. Current shareholders (as of June 25, 2024): Felix Teodorico Romero Lopez (95% — 26,600 participations, also General Manager) and Jorge Arturo Ramos Cafferata (5% — 1,400 participations). All annual validity rights (derecho de vigencia) are actively paid through 2024 (US$ 300/year).
The transaction is structured as a 100% acquisition of the mining concession and the associated corporate entity (Cia. Minera Alpes y Cumbres S.R.L.). This ensures a seamless transfer of all existing permits (SERNANP, CIRA, ANA), water rights, and legal titles — without the need to re-apply or re-validate any of the secured permits. This is a significant advantage over typical asset acquisitions where permits must be re-applied for under new ownership, often causing 12-24 month delays. The incoming operator benefits from immediate operational continuity and a secure, compliant foundation for underground extraction. The corporate structure is clean and simple, with only two shareholders, facilitating a rapid and efficient transaction process.
The project holds a designated underground mining extraction area ("UKU") with all preliminary environmental and operational frameworks established. The concession is located in the Chipurana / Huimbayoc districts, San Martín Province, San Martín Department, within the Carta Nacional Papa Playa (13-L). The project is situated within the Parque Nacional Cordillera Azul buffer zone with full SERNANP compatibility, providing a secure environmental framework for long-term underground operations. The concession is also overlapped by the Proyecto Especial Huallaga Central y Bajo Mayo, which has been confirmed (via official report) NOT to constitute a hydroelectric or hydraulic project, thus removing any related restriction. The project is at an advanced development / near-production stage — with all permits, water rights, and legal titles secured. This represents a rare "shovel-ready" opportunity for a well-capitalized operator to inject strategic CAPEX and commence underground extraction immediately, without the typical 3-5 year permitting timeline faced by most greenfield projects in Peru.
Mina Alpes y Cumbres fully permitted mining inquiry form


Request Data Room Access

Strict protocol: NDA execution and introductory fee required to access the CIM, SERNANP/CIRA/ANA documentation, SUNARP registration, and full corporate due diligence. Our investor relations team responds within 24 hours.